Thanks all for the input. I'll just run 8X jumpers from my bonding panel to the K3. The operating point is on the first floor directly above the basement service entrance and bonding panel with polyphasers so it will only be 10ft. Now to order a bunch of coax and connectors. 73 jim ab3cv