[Elecraft] RF Board Assembly

Ron D'Eau Claire [email protected]
Wed Mar 5 22:21:01 2003


Under the screw head. The 2D fastener sits right on the board.

Ron AC7AC
K2 # 1289

-----Original Message-----
I just want to clarify how to install the 2-D fasteners to the RF board.

On P.33 Elecraft say to install these with 2 chssis screws and 2 lock
washers.

Do the lock washers go in between the 2D Fastener and the board, or the
screw head and the board?

Cheers,

Dave.