[Elecraft] RF Board Assembly

David Walker [email protected]
Wed Mar 5 21:39:01 2003


I just want to clarify how to install the 2-D fasteners to the RF board.

On P.33 Elecraft say to install these with 2 chssis screws and 2 lock =
washers.

Do the lock washers go in between the 2D Fastener and the board, or the =
screw head and the board?

Cheers,

Dave.

--- StripMime Report -- processed MIME parts ---
multipart/alternative
  text/plain (text body -- kept)
  text/html
The reason this message is shown is because the post was in HTML
or had an attachment.  Attachments are not allowed.  To learn how
to post in Plain-Text go to: http://www.expita.com/nomime.html  ---