[TheForge] OT: My floor is poured: the saga
Andrew Vida
osan at netlabs.net
Sun Oct 12 21:39:53 EDT 2014
Block mason starts work tomorrow.
When done, concrete company will pour a new 6" thick floor atop the one
they botched, on their nickel. I will have a 12" thick concrete floor.
Just for information: if anyone will be pouring a floor in the future
and you're debating whether to putin remesh, debate no more. The north
end of my new 6" floor has the mes sitting on the botton because the
concrete was too stiff to move it up into the middle region. There is a
fine crack in the new pour, about 12' long.
Steel in the concrete makes all the difference in the world. Never
forget that. I sure as hell will not.
Setting the drain is going to be "interesting". I thnk I'd rather a
sharp stick in the eye.
More information about the TheForge
mailing list