In a message dated 7/25/2003 1:30:01 AM Central Daylight Time, 
[email protected] writes:

> is there a short way of explaining the project? example today after the
> concrete shower floor was demolished is was clear that the sub-floor has
> serious water damage along with the surrounding walls. it took close to
> an hour and half to explain that the sub-flooring needed to be replaced
> and the walls would have to be torn out and rebuilt with new lumber.
> these walls were not on the original plan to demolish.
> 

If yer initial explanation was not clear enough perhaps a well used torch or 
even better a hammer can be used to clearly indicate which wall and what part 
of the sub floor that needed to be replaced.  A side effect of this is a 
relief of stress once a sizable "indicator" hole has been created in the offending 
structures.  

Time enough for sleep in the grave.
Tod

Home of no mistakes but plenty of ART! 
Lamp, Oh I thought I was making frog gigs and sparklers.


--- StripMime Report -- processed MIME parts ---
multipart/alternative
  text/plain (text body -- kept)
  text/html
The reason this message is shown is because the post was in HTML
or had an attachment.  Attachments are not allowed.  To learn how
to post in Plain-Text go to: http://www.expita.com/nomime.html  ---