[NLRS] [Fwd: [Mw] [Fwd: [AR902Mhz] ARCC proposes revision of
33cm bandplan]]
James French
w8iss at wideopenwest.com
Sun Aug 10 11:01:28 EDT 2008
Scott,
The reason for the 25Mhz spilt is because almost ALL the Motoroloa and
commercial gear that is available for modification can ONLY do a 25Mhz
split. This gear can not handle a 12mHz split as was proposed by the
ARRL in their original bandplan.
The ARCC seems to have their act straight when they proposed this change
to their band plans and have TRIED to accomodate eveyone from weaksignal
to ATV repeaters/users.
James W8ISS
PS-I didn't send it to the NLRS list as most everyone is a member of the
other lists and I am trying to be a polite member of this email list. I
will only reply here if I see something that doesn't get posted to the
other lists. I will try to keep the crossposting to a minimum if
possible.
More information about the NLRS
mailing list