[Elecraft] order of construction for k3
Don Wilhelm
w3fpr at embarqmail.com
Wed May 26 21:13:17 EDT 2010
Stephen,
I do not believe there is any conflict, or preferred order. The DVR
fits onto the Front Panel/DSP assembly, the XV3 fits onto the back
panel, and the 2nd RX fits in the middle of everything.
Because of the KRX3 antenna connector in close proximity to the KXV3, it
would be helpful to install the KRX3 while the KXV3 is removed. But
that is just a subjective observation - the only "problem" is the
plugging of the TMP cable into the KRX3 ant input - it is at an angle
that makes it easier with the rear panel assembly out of the way.
73,
Don W3FPR
stephen pearce wrote:
> Hi
> I have the 2nd rx, dvr and xv3 ready to install preparatory for the
> arrival of the p3.
> I want to install all 3 in one go.
> The manuals are written as if you were starting from scratch each time.
> Could someone (maybe who has already done this) give me some advise of
> the sequence of approach
> given that I want to do all 3 installations in one go
> Mni Tnx
> 73
> de zl1any
>
>
>
More information about the Elecraft
mailing list