[Elecraft] KAT2 instructions - error?

Don Wilhelm w3fpr at embarqmail.com
Sun Aug 26 11:45:27 EDT 2007


Andrew,

There must be a lockwasher at one end of the standoff - it is an overall 
length thing, so it really does not matter which end of the standoff the 
lockwasher is placed.  Do what seems right - yes, the manual says it 
both ways, and that is confusing.  It is easier to put the lockwasher on 
when first mounting the standoff than it is to slip a lockwasher on top 
of the standoff when attaching the second board to the other end - that 
is all there is to it.  The manual words are correct, the diagram is 
older and shows the 'hard' way to do it.

73,
Don W3FPR

Andrew Moore wrote:
> KAT2 rev D manual, page 12.
>
> Step says 
>
> Secure the L-C board to the Control board standoffs using two 4-40 screws and two #4 split lock washers.  These lock washers go between the standoffs and the PC board, not between the PC board and screws as on the control board.
>
> ---
>
> However, page 6 diagram of control board screw/standoff assembly clearly shows a different order: from bottom up: screw, Control board, washer, standoff.  Not what the above step says.
>
> Is the manual wrong, or am I missing something?
>
> Thanks,
> --Andrew
> _______________________________________________
> Elecraft mailing list
> Post to: Elecraft at mailman.qth.net
> You must be a subscriber to post to the list.
> Subscriber Info (Addr. Change, sub, unsub etc.):
>  http://mailman.qth.net/mailman/listinfo/elecraft    
>
> Help: http://mailman.qth.net/subscribers.htm
> Elecraft web page: http://www.elecraft.com
>
>
>   


More information about the Elecraft mailing list