[Elecraft] Three K2 Upgrades: Questions

Bill Coleman [email protected]
Wed May 7 08:08:01 2003


On 5/6/03 2:13 PM, Phil Wheeler at [email protected] wrote:

>I will soon be doing the following to my K2/100
>
>o Installing the 14 matched xtals
>
>o The BFO upgrade
>
>o The PLL temp stabilization mod
>
>I believe this is the correct sequence for these mods -- yes?

The first two are standard with the A->B mods. A->B also includes a mod 
to the PLL, the temp stabilization is just an additional mod beyond that.

>If so, how much (and what) tune-up should I do between steps?  In the 
>extreme, I could just record all my current BFO, filter settings, etc., 
>do all three mods, and then re-calibrate.  I suspect that would be 
>imprudent.

If you look at the A->B instruction sheet, they have you do just about 
everything and then do alignment. 

My suggestion is that you also order the A->B parts kit, if you haven't 
already. (If you have a B model K2, then you shouldn't need to do the 
crystal or BFO mods....)



Bill Coleman, AA4LR, PP-ASEL        Mail: [email protected]
Quote: "Not within a thousand years will man ever fly!"
            -- Wilbur Wright, 1901