[Elecraft] Contest Calendars

Tom Hammond [email protected]
Sat Dec 20 22:20:01 2003


At 09:19 PM 12/20/03, Tom Hammond wrote:
>Hi Dave:
>
>This means use holes 1 & 3 (left & right, leaving the middle hole empty. 
>refer to K2 (Rev E) manual, Appendix B, RF Board 3 of 4, top left corner, 
>and you'll see where C6 is installed across J15. Removes all questions.
>
>73,
>
>Tom    N0SS
>
>At 09:05 PM 12/20/03, you wrote:
>>Gangue,
>>
>>Can someone help me decipher the first instruction, right column, on page 
>>54 of the K2 manual?  Manual rev is 'E'. Just below the install of RFC 2 
>>and RFC 7.
>>
>>Installing C6, presumably on the bottom of the board (although it does 
>>not say that).
>>
>>It says to use the outer two of the three pads in that line.  Does this 
>>mean the two pads closest to the edge of the board (the outer two) or 
>>does this mean the two outside holes of the three, i.e. the middle hole 
>>is not used?
>>
>>Which might it be?
>>
>>tnx es 73 de dave
>>ab9ca
>>
>>_______________________________________________
>>Elecraft mailing list: [email protected]
>>You must be subscribed to post to the list.
>>To subscribe or unsubscribe see: 
>>http://mailman.qth.net/mailman/listinfo/elecraft
>>Elecraft Web Page: http://www.elecraft.com
>>Also see: http://www.elecraft.com/elecraft_list_guidelines.htm