What kind of house do you have sitting on this? 5 story masonry???
8" block is all you need with possibly some pilasters at bearing beams. What you are proposing is just money down a hole.
Do a good job with the backfill so you get rid of the water pressure.
>My idea is to lay 1/2 or 1/3 cap blocks in a doubled manner with 8"
>space between and fill with concrete or grout.
>
>At the bottom where pressures are high, ever other block would go 90* to
>the wall and act as a tie to prevent a blowout. Rebar atop each
>course. Should be plenty strong... 16" thick wall. Cap them off and in
>the space between the top of the cap and the bottom of the existing
>footing, pack in hydraulic cement, which will expand and thereby take up
>the load. Hydracide the outer surfaces, put in drains and backfill.
>
>Anyone see any holes in that plan?