[TheForge] OT: My floor is poured: the saga

Andrew Vida osan at netlabs.net
Tue Sep 16 00:19:03 EDT 2014


On 9/8/14, 10:52 PM, jerry Frost wrote:
> It shouldn't have started setting up even if they just let it sit half an
> hour after pumping. That sounds like they added an accelerant at the batch
> plant alright. Take a sample to the State Materials lab for analysis, the
> concrete co. is picking up the bill. Have your lawyer charge it back.
I have now spoken with at least a dozen people in the area who do or 
have done concrete professionally and when I told the story, the first 
thing out of EVERYONE'S mouth was "calcium"... they must have put in 
calcium to accelerate the set.  But why?
>
> High humidity weather can allow steam because it's already near the dew
> point but the basement shouldn't have been appreciably hotter than ambient.
Basement is notably cooler than ambient, typically, and was that day as 
well.
> Did you try touching the slab or pile setting up in the driveway? I'm almost
> betting a letter of intent from a lawyer will start getting  offers to
> settle out of court. Don't forget to add emotional distress, etc. etc. It
> SHOULD cost them to keep you quiet. Suckers MUST pay.
Oh, I'm not going quietly on this one.  I've had quite enough of getting 
screwed around by these two half-wit outfits, thankyouverymuch.  
Readymix company is not returning my calls... I'm a very forbearing 
person, but once you demonstrate to me your malice, I go for the 
carotids, which is the next move after giving them ONE more opportunity 
to make like a cowboy.

As for Marco... that will be a bigger nut to crack as they have driven 
my cost to do what I need to do up by at least a factor of 4 or 5.  
Engineer told not to cut footings for fear of another shear failure.  
Already have one right in the middle of where those dildoes placed one 
of the brackets.Not more than 1/16 shift, but that 1/16 more than I 
wanted.  But because the $$ have now gone way up, I'm sure Marco will 
admonish me to screw myself, in which case I will have to get very 
serious with them... but that takes time and time we do not have in any 
reserve.  When it goes single digits, we are going to be in serious shit.
>
> Jer
> -----Original Message-----
> From: TheForge [mailto:theforge-bounces at mailman.qth.net] On Behalf Of Andrew
> Vida
> Sent: Saturday, September 6, 2014 7:52 AM
> To: Blacksmithing List Sponsored by ABANA
> Subject: Re: [TheForge] OT: My floor is poured: the saga
>
>
> On 9/5/14, 3:13 PM, jerry Frost wrote:
>> It is if he stopped for coffee or lunch. Once concrete starts to set
>> it sets pretty quickly. A concrete company that screws up a pour like
>> this will have people blaming others, it's the guy in the mixing
>> tower, the guy in the truck, the finishers, etc.
> Well, the one person they cannot blame is me.  The pumpers and finishers
> were also blameless.  The mix appeared normal until about 1/2 hour in, after
> about 5 or so yards were put down.  All of a sudden it started hardening up
> very quickly and the finisher was not happy.  I didn't realize how bad it
> was until a while later.
>
> These bastards are going to tell me to go scratch and then I will have to
> take up my iron bars - there's the smithing content. :)
>> When you say it got hot, how hot?
> The 7 yards remaining in the truck was putting off very visible vapors in
> 90*+, 90%+ humidity.  It was not hot in the basement, so they cannot claim
> that we should have known.  Everything seemed perfect until the very sudden
> and rapid change in the character of the mix.  Prior to that, I was
> shoveling concrete up into the low spots because it was flowing well.
>
>>    Concrete should get warm as it sets but even a 24" footing should be
>> too cool for a bath. If a slab is getting hot, say steaming on a cool
>> day it's a hot mix, either WAY past pour time or a hot mix from the
>> batch plant.
>>
>> How'd your footings come out?
> Sagged slab - integral footing.  3 runs of #5 rebar all four sides about
> 2-3 inches from the bottom, right where it belonged.  Engineer friend said
> one would have sufficed and that three makes for a very strong footing.
> Footings average about 16" deep x 24 wide.  Floor is about 5"
> average with a few thinner areas, perhaps 3.5"... still plenty, especially
> with the mesh in it.
>
> My only concern now is whether it is too far out of level for a mason to lay
> block, if I choose to go that route, which at this point I may because the
> forms are now up to about $5K and there is no possible way.
> I'd planned on $500-$600, using the clay as the outer form, but the
> imbeciles at Marco scotched that big time.
>
> ______________________________________________________________
> TheForge mailing list
> Home: http://mailman.qth.net/mailman/listinfo/theforge
> Help: http://mailman.qth.net/mmfaq.htm
> Post: mailto:TheForge at mailman.qth.net
>
> TheForge mail list group photo site is
> http://www.shutterfly.com
> Login: blacksmithblacksmith at hotmail.com
> Password: anvil
>
> This list hosted by: http://www.qsl.net
> Please help support this email list: http://www.qsl.net/donate.html
>



More information about the TheForge mailing list