[TheForge] New land and future forge

Jerry Frost akfrosty at mtaonline.net
Mon Apr 6 03:01:21 EDT 2009


That's terrific Steve, congratulations.

I know how good I felt to be able to walk into my own 
shop and put what I wanted where I wanted it without 
anyone being able to say boo. No problem with her shop 
being larger so long as you get a nook to store things 
in. <grin>

Seriously mate a halfway competent scrounge could fill 
your shop in an afternoon. Mine is 30' x 40' and it was 
getting crowded before I got the roof on it. <grin>

How much are you going to ship back from England? 
Something with a name like Massey on it I hope?

Frosty
-------------------------------
If it ain't forged
it ain't real.
Wrought iron is.
The FrostWorks

Meadow Lakes, AK.


From: "Stephen Viola" <wombatforge at gmail.com>


> Hi all,
> I just wanted to let you all in on my latest and 
> perhaps most exciting
> project yet!
>
> The papers (although delayed due to recent flood 
> waters) have gone
> through and the purchase of 6.2 acres is complete. 
> Set in the
> sub-tropicaly location near Dorrigo (Australia) my 
> partner and I have
> set the plans in motion and have ordered 2 sheds 
> (barns). Hers is 12m
> x 16m and my forge a more modest 6m x 9m.. now before 
> you all go
> telling me there is something coherently wrong with 
> the "she shed"
> being bigger than the "he shed" the plans for the 
> bigger barn is to be
> split into her jewelry making, painting and other 
> "cleaner" activities
> including a shop for the tourist season. My modest 
> forge however will
> be 100% dedicated to the testosterone filled activity 
> of metal abuse.
>
> The roof of the "wombat Forge" measures 3.9 metres 
> should be enough to
> install a sufficient bridge crane and as I do not (as 
> yet) posses any
> large machinery the floor plan is very much a white 
> canvas! All very
> exciting!!! The downer is I am in London at the 
> moment I am not able
> to get my hands too dirty with this project... but 
> the barns should be
> up and ready by August this year. Obviously this 
> whole project is
> still in an embryonic phase and we even plan to live 
> in the bigger
> barn for a year whilst we build out yurt houses.. but 
> finally we are
> making great strides towards realising our dream 
> house with dream
> forge in a dream location!!
>
> I will keep you all posted with the slow but steady 
> progress and post
> pictures when there is something to show.
>
> :o)))))))
>
> Steve
> ______________________________________________________________
> TheForge mailing list
> Home: 
> http://mailman.qth.net/mailman/listinfo/theforge
> Help: http://mailman.qth.net/mmfaq.htm
> Post: mailto:TheForge at mailman.qth.net
>
> TheForge mail list group photo site is
> http://www.photoaccess.com
> Login: blacksmithblacksmith at hotmail.com
> Password: anvil
>
> This list hosted by: http://www.qsl.net
> Please help support this email list: 
> http://www.qsl.net/donate.html 



More information about the TheForge mailing list