[Scan-DC] Silver Line Rail Operations
John Nash
j.m.nash at verizon.net
Fri Jun 27 08:46:02 EDT 2014
It was announced that the Metrorail Silver Line will become operational on July 26 2014. The opening will be proceeded by a 30 day shakedown test of rail operations that should have started yesterday. Still looking to determine if the Sliver Line will be added to OPS 2 with the Blue and Orange Lines or if a new talkgroup will be added.
Thanks,
John Nash
Falls Church VA
More information about the Scan-DC
mailing list