With all this discussion, I've attached a recent summary of the R-390A production that I have been tracking for a long time.
a couple of notes:
1) if there is no evidence of it, it's not in my list.2) the 1960 EAC numbers I've seen have a gap between 969 and 2591. Maybe I've just never seen one in that range, but none of the other contracts have a gap like that, so the total production might be 1500 or so lower that apparent.
See the attached pdf for the latest I have.
Tom N5OFF