[R-390] Inspection _List

Roger Ruszkowski flowertime01 at wmconnect.com
Wed Sep 12 16:12:05 EDT 2012



Jerry,

You need all 6 parts.

We have size limits on files.
If Part_4 shows up, It will be because your Sys Admin / Moderator
saw fit to humor me and let another over size file go.

He has in the past bumped the file size up twice just
to accommodate my verbose behavior. So I resent 
part 4 as 4 and 4B

And I thank him for having uped the file size in the past.
I will live with 99K file size.
 
I know the subject is R390 but this inspection / test / alignment process
will work equally well on the R390 or R390/A or R392

In the beginning is a set of section titles A-Z.

I see what you mean about the Pearls of Wisdom being big files.

A lot of information in those files.

I am happy W Li is providing them.

To happen to "feel" every R390 or R390/A owner needs to read
every bit of those file. But that's just me.

Jerry, 
I hope you can patch these 6 files back into about a 27 page word
document and get some use out of it.

Roger.
 


More information about the R-390 mailing list