This paper is still not complete.
Nothing in this work is original to Roger Ruszkowski. I acknowledge that I
copied and pasted every bit of it from others. Contributors include at least
the following Fellows. The contributions are not limited to the following
Fellows. Additional names may be added at any time. Acknowledgements appear
in no special order. :R-390 at mailman.qth.net
David Melody became a SK May 2 2010. in Tucson Arizona
David Melody, Tisha Hayes, Barry Hauser, Tom Marcotte, Walter Wilson, W.
Li, Nolan Lee, Pete Wokoun KH6GRT, David Wise, Al Tirevold, John Harvie, John
Patterson KB4SLV, Joe Foley, Dan "Hank" Arney KN6DI, Walter Wilson, John
Bunting, W4NET, Jim Miller, N4BE, , Al Solway, Dan Malone KAØCWD, Dr. Gerald
Johnson, Chuck Rippel, Glenn Little, Bruce Maclellan, Norman Ryan, Dallas
Lankford, Scott Seickel, Perry Sandeen, DW Holtman, Gary Gitzen, Tom Norris,
James A. (Andy) Moorer, Scott Seickel, Matt Parkinson, Don Heywood, Cecil
Acuff, Pete Williams, Russ WA3FRP, Barry - N4BUQ, Roger L. Ruszkowski AI4NI
We want something that will sit there and run for month after month and
need nothing but tubes and dial lamps. Nolan. 5/99.
DB Watts Volts Ohms Amps
00 00.0010 00.7746 600 00.0013
01 00.0013 00.8691 600 00.0014
02 00.0016 00.9752 600 00.0016
03 00.0020 01.0941 600 00.0018
04 00.0025 01.2277 600 00.0020
05 00.0032 01.3774 600 00.0023
06 00.0040 01.5455 600 00.0026
07 00.0050 01.7341 600 00.0029
08 00.0063 01.9457 600 00.0032
09 00.0079 02.1831 600 00.0036
10 00.0100 02.4495 600 00.0041
11 00.0126 02.7484 600 00.0046
12 00.0158 03.0837 600 00.0051
13 00.0200 03.4600 600 00.0058
14 00.0251 03.8822 600 00.0065
15 00.0316 04.3559 600 00.0073
16 00.0398 04.8874 600 00.0081
17 00.0501 05.4837 600 00.0091
18 00.0631 06.1528 600 00.0103
19 00.0794 06.9036 600 00.0115
20 00.1000 07.7460 600 00.0129
21 00.1259 08.6911 600 00.0145
22 00.1585 09.7516 600 00.0163
23 00.1995 10.9415 600 00.0182
24 00.2512 12.2765 600 00.0205
25 00.3162 13.7745 600 00.0230
26 00.3981 15.4552 600 00.0258
27 00.5012 17.3411 600 00.0289
28 00.6310 19.4570 600 00.0324
29 00.7943 21.8311 600 00.0364
30 01.0000 24.4949 600 00.0408
31 01.2589 27.4837 600 00.0458
A. Current State
B. Modifications Installed
C. Cosmetic Clean Up
D. Hard Core RF Module Cleaning
E. Cosmetic RF Module Cleaning
F. Rebuild Inspection / Visual Inspection
G. Reassemble The Receiver
H. Mechanical Alignment
I. Knobology Dynamic Testing Monthly Test
J Adjust the IF gain R519
K. Alternate Procedure To Set The IF Gain Control
L IF Module Alignment
M. To Stager Or Not To Stager
N. To Stager Tune IF
O. To Straight Tune IF
P. Adjust Z503 AGC
Q IF And Audio Module Tube Optimizing
R. Adjust T208, C520, L503, and Zero BFO
S 2nd Crystal Oscillator Alignment
T 1st Crystal Oscillator Alignment
U VFO Band Spread Test
V VFO Band Spread Adjustment
W. RF Alignment
X RF Deck Tube Optimization
Y. Receiver Sensitivity Test
Z. Signal To Noise Test