[R-390] Depot Dawgs

Ed Zeranski ezeran at ezeran.cnc.net
Fri Jul 29 00:03:52 EDT 2005


I worked in a Depot for 5 years, Naval Air Rework Facility (NAS
Norfolk).

EVERY ITEM WE OVERHAULED HAD TO PASS THE FACTORY SPEC.

PERIOD.

..
Zero defects were the stated goal at my facility, EVERY piece of gear
I personally overhauled had a document with MY artisan stamp (number
unique to the tech) on it. Plus, there was a SEPARATE Quality
Assurance Dept. that sampled 50 to 100 percent of the output of
equipment from the shop.

God forbid you got a QDR (Quality Deficiency Report) back from the
customer on a piece of gear you certified as spec.

Same process at Long Beach and North Island. 

EdZ


More information about the R-390 mailing list