[R-390] Some progress

Jim Shorney Jim Shorney" <[email protected]
Sun, 05 Jan 2003 11:22:38 -0600 (CST)


-----BEGIN PGP SIGNED MESSAGE-----

On Sun, 5 Jan 2003 12:06:03 -0500, polaraligned wrote:

>I think most electrical
>services use
>an aluminum feed from the pole to the panel.

Yep.  I've got a chunk of this very cable as the earth ground for my
<Drake> transmitter.  Multi-strand aluminum clear through.

- --
Jim Shorney      -->.<--Put complaints in this box
[email protected]
[email protected]
Ham Radio NU0C
Lincoln, NE, USA
EN10PT
http://incolor.inetnebr.com/jshorney/
-----BEGIN PGP SIGNATURE-----
Version: 2.6.2

iQCVAwUBPhhp3kCBN4ScxcExAQHNLAP/TgrUYBfpnVm3TKuS+HJ4IRfi85I/eZwW
j+Y/ArwrJC+6E+ZQkG5DRsRO6DYCAh+1YrO9IV60AmHZK+rMaTdaqgyeilPnApHC
TTSuXiaAAEKurW2c2dc7F3J/dqFtdYHmSGlKlqPes6NnYH9mYD2hRRnqeqoGPCOf
KRBq7mv2izc=
=2VBb
-----END PGP SIGNATURE-----