I suggest:
-- Swap out dead 2.4 Omni for a 5.8 Omni to enable Xenia-Yellow Springs access.
-- Install SXT pointing at me
-- Install SXT pointing at NQH and MVHS
-- Install SXT pointing at Jim Simpson's
-- Swap out both surge suppressors at top of tank.
Do the SXTs allow power passthrough to a second node? If so, I presume this configuration could be supported on the two existing CAT-5 Lines. In any case we should consider cost of pulling two new lines (including cost of 4 additional surge suppressors), vs cost and risk of using power switches, vs cost and risk of using SXT power pass-through.
Based on what I think are estimated costs, I would be willing to pay for or donate:
- 5.8 Omni
- 5.8 SXT pointed at me
- 5.8 SXT pointed at Simpson's
- Climb by WS
- Two new surge suppressors used for swap at top (assuming existing suppressors on 2.4 Omni are toast).
I suggest MVMA pay for:
- SXT at Simpson's pointing at Blue Tank
- LHG at MVHS pointing at Blue Tank
Bill
Please give me an example next project at blue tank.