  * Tyler KI7ODK, Bill WA8APB, Tim N8NQH, Chuck NC8Q, and David KX8U
    met at 9 AM at Miami Valley Hospital South campus.
  * Tyler and Bill re-terminated the ethernet cables on the roof.
  * Chuck re-installed and re-aimed the NC8Q-MVHS-Kettering node.
  * David and Tim worked in the 'radio room' moving everything
    MVMA related out of the cabinet shared with the Centerville ARC and
    into the MVMA cabinet.
  * David installed a 48 port RJ45 punch down panel in the new cabinet
    and connected the 7 ethernet roof-bound cables, reinstalled the
    surge suppressors, and installed the 48 port VLAN switch.
  * David and Chuck left around 3 PM.


Thank you Tyler, Tim, Bill, and David.

73, Chuck