[MVMA] Miami Valley Mesh Alliance 2019-09-14 meeting minutes:
Chuck Gelm
nc8q-mesh at gelm.net
Sun Sep 15 08:56:41 EDT 2019
On 9/14/19 6:03 PM, Chuck Gelm wrote:
> 13:30 The fiber option isolation devices were in stalled at DARA.
Best to check everything after entering a report on a device with auto
spell check. :-|
13:30 The fiber optic isolation devices were installed at DARA.
--
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.qth.net/pipermail/mvma/attachments/20190915/44f4ae57/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: signture.gif
Type: image/gif
Size: 5012 bytes
Desc: not available
URL: <http://mailman.qth.net/pipermail/mvma/attachments/20190915/44f4ae57/attachment-0001.gif>
More information about the MVMA
mailing list