I saw a similar setup at the Bombardier plant in Barre Vermont.
They had huge (think harnesses for a subway car) boards with the
pins on them. It was kinda cool seeing how they made them.
73
DE KA1LHZ
This was on Facebook last night (ahd was originally from Shorpy's).
The description was " 1942. Boeing aircraft plant, Seattle. Production of B-17 'Flying Fortress' routing wires"
I've often wondered how they made the wiring harnesses. For this particular section, metal studs are spaced for length accuracy.
73 Mark K3MSB
______________________________________________________________ MRCA mailing list Home: http://mailman.qth.net/mailman/listinfo/mrca Help: http://mailman.qth.net/mmfaq.htm Post: mailto:[email protected] This list hosted by: http://www.qsl.net Please help support this email list: http://www.qsl.net/donate.html