>From the ARRL Contest Rate Sheet of Dec 15 04---(We are not alone) A problem discovered in the IARU log checking process will cause the results to be printed in the March issue of QST instead of February, allowing time to ensure the corrections made by the log checking team are done properly. All other log data entry and processing is on schedule.