[HBR] Eddystone 898 dial drive

Whitebear1122 whitebear1122 at comcast.net
Tue Apr 16 20:31:04 EDT 2013


I have the template and 898 in front of me.  What you are looking at is a metal shipping bracket attached to each side.  Mine is green.  That comes off.  It's there solely to support the dial and string in the shipping box.

The template shows the cutout for the slide rule.  I had to look closely at first because it was confusing with those drill holes in the 4 corners of the inside radius.  What i surmise is that the holes are drilled first to give the soon to be opening a proper inside radius, then the builder cuts out the rest of the opening to the radiuses.  Did I describe it ok?  Then the outside frame mounts to the panel and ties into the slide rule using the 4 5/32" mounting screws.

I've been slowly collecting parts as well.  I have everything except a couple boxes of screws and nuts, have all the rest.

Email if you have questions.  


73, Scott WA9WFA
On Apr 16, 2013, at 4:28 PM, Chris Howard w0ep <w0ep at w0ep.us> wrote:

> 
> I am slowly accumulating parts for my HBR.
> 
> I just received an Eddystone 898 dial drive.
> 
> About the Eddystone drive, how do I mount the thing?
> It comes with a piece of paper which says it is a template.
> Do I have to drill holes in the vertical end pieces to
> mount it? I'm not clear on how it goes.
> 
> Chris
> w0ep
> 
> ______________________________________________________________
> HBR mailing list
> Home: http://mailman.qth.net/mailman/listinfo/hbr
> Help: http://mailman.qth.net/mmfaq.htm
> Post: mailto:HBR at mailman.qth.net
> 
> This list hosted by: http://www.qsl.net
> Please help support this email list: http://www.qsl.net/donate.html



More information about the HBR mailing list