A very interesting thought- is there any chance this was done with WLW at 500KW during WW2?  I think the last full power transmission was during the war for Pres. Roosevelt to address the Germans. I know he intervened with the FCC to keep the 500KW transmissions going after the "experimental" period.

   Bruce Gentry, KA2IVY

On 4/19/23 19:22, steve bennett via GreenKeys wrote:
Ever heard of this?
Inline image


______________________________________________________________
GreenKeys mailing list
Home: http://mailman.qth.net/mailman/listinfo/greenkeys
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:[email protected]

Jordan Spencer Cunningham's GreenKeys Search Tool: https://teletype.net/gksearch
2002-to-present greenkeys archive: http://mailman.qth.net/pipermail/greenkeys/
1998-to-2001 greenkeys archive: http://mailman.qth.net/archive/greenkeys/greenkeys.html
Randy Guttery's 2001-to-2009 GreenKeys Search Tool: http://comcents.com/tty/greenkeyssearch.html
This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html
Message delivered to [email protected]