[Elecraft] P3 Failure and such
Bob McGraw K4TAX
rmcgraw at blomand.net
Mon Apr 12 14:55:34 EDT 2021
I’ve always found and was taught that one should not just dump the power on station shut-down. This could be the cause of many mysterious and lucid operation
Likewise; on power up:
(A). Power supply on first
(B). Transceiver on next
(C). P3 on if not powered from the K3
(D). KAT500 on if not powered from the K3
Shutdown the items in reverse order. NEVER just dump the power as there is a Power Down Imminent (PDI) circuit which saves data and then correctly shuts down the systems.
73
Bob, K4TAX
Sent from my iPhone
More information about the Elecraft
mailing list