[Elecraft] KPA500 problem

Victor Rosenthal 4X6GP k2vco.vic at gmail.com
Wed Apr 15 01:18:07 EDT 2020


Wow, that is neat! Very impressive. Are you going to make one for the 
various audio and control circuits as well?

I chose to place my operating desk two feet from the wall. I refer to 
the area behind it as the "cable vault." This solution is cheap in terms 
of money and effort, but very expensive of space. Of course the panel 
takes up space on the desk and facing the operator, which is also very 
valuable.

73,
Victor, 4X6GP
Rehovot, Israel
Formerly K2VCO
CWops no. 5
http://www.qsl.net/k2vco/
On 15/04/2020 0:34, Dave Cole wrote:
> Odd you should mention that...  I am rebuilding my operating position, 
> and am installing a patch panel...  See:
> 
> https://www.nk7z.net/rf-patch-panel/
> 
> For a close up of teh patch panel.  I used one of those services that 
> give you the design software, and then build to your spec...
> 
> 73, and thanks,
> Dave (NK7Z)
> https://www.nk7z.net
> ARRL Volunteer Examiner
> ARRL Technical Specialist
> ARRL Asst. Director, NW Division, Technical Resources


More information about the Elecraft mailing list