Eric,

In many cases, the problem being dealt with is the currents flowing 
through the "grounds" and complicated by what K9YC refers to as the "pin 
1 problem" in that the connectors for audio and RF paths are grounded to 
the circuit boards, but not to the enclosure (the enclosure *should* 
shield the boards and inter-connects, but it does not in modern gear).

While a single point star grounding system may be best from an EMC point 
of view, it is not the best for noise reduction and 'sneak paths' in the 
gear we deal with in a ham station.  In fact the multiple paths to that 
single point ground can create currents in the grounding system giving 
rise to noise in the gear that we are trying to reduce the noise.

Review Jim's presentation on grounding in entirety.  Jim does speak from 
many years of experience dealing with noise and sneak paths in 
professional audio installations, and I respect his opinions based on 
his years of experience dealing with these issues.

If you have no ground current induced noise and are only striving for a 
lightning protection grounding scheme, then yes, the single point 
grounding system is the way to go, but that is not the situation in the 
modern ham station where we have to deal with audio and digital paths 
to/from computers, interface devices, ancillary gear and "who knows 
what" to the transceiver.  Bonding all equipment together (with a mind 
to the path for the audio and RF) will minimize the extraneous noise 
currents on the shields between the boxes in the shack which will reduce 
the noise level in the receiver.

I too have years of experience with design and testing for EMC 
considerations, and as I have indicated, each method of grounding has 
its place, but we are not dealing with EMC considerations alone.

73,
Don W3FPR

On 11/25/2014 5:46 PM, Eric Buggee wrote:
> Hi all,
>
>     One additional comment regarding grounding for RF interference, 
> extraneous noise & elecrical safety considerations is that the 
> preferred method for grounding should be:
>
>     Single point grounding, ie all rig & amplifier ground connections 
> should be taken from a single point, (shack grounding buss).
>
>      Relying on "daisy chain" grounding for example: through coax 
> cable(s) & their connectors; Rig > Amp > tuner > tground point can be 
> the source of intermittent RFI & distortion
>
>     problems that can be difficult to nail.  This approach to 
> grounding should NOT be used for the foregoing stated reasons.
>
>     Eric, VK3AX. Retired EMC engineer.
>
>
>
> On 11/26/2014 4:21 AM, Jim Brown wrote:
>> On Tue,11/25/2014 8:08 AM, Don Wilhelm wrote:
>>> Bonding the station equipment together and to a station ground point 
>>> is to keep all the gear at the same potential and can assist with 
>>> such things as extraneous noise pickup, stray RF and other 
>>> electrical annoyances. 
>>
>> Excellent advice. And there are other good reasons.
>>
>> Here's a talk I did this fall at Pacificon on the topic of grounding 
>> and bonding.
>>
>> http://k9yc.com/GroundingAndAudio.pdf
>>
>> 73, Jim K9YC



More information about the Elecraft mailing list