[Elecraft] KX3-2M and -4M now available to order
Lyle Johnson
kk7p4dsp at gmail.com
Fri May 16 13:19:05 EDT 2014
Mike, see below:
> Eric wrote:
>
>> The KX3 2M FAQ, which will also apply to the -4M, can be reached at:
>> http://www.elecraft.com/manual/KX3-2M%20FAQ.htm
> The FAQ question that follows raises a number of additional questions:
>
>> Q: What is the current drain on 2 meters?
>>
>> A: Current drain is typically 300-350 mA on receive and 1.5 A on transmit
>> at 3 watts, running from a 14 V supply.
> Is that the *TOTAL* current drawn by the KX3 with KX3-2M installed, or is
> this *ADDITIONAL* current draw to that of the KX3 without KX3-2M?
It is the total KX3 current drain.
> Is there a front panel function that may be used to turn off the KX3-2M and
> restore the pre-installation KX3 current consumption when 2m isn't desired?
Just set a band other than 2 meters, and the 2 meter module will power down.
>> We're also working on a standby mode (when squelched) that should reduce
>> average current drain to between 180 and 200 mA, depending on the dwell
>> time selected by the user.
>
> I have the same question...is this squelched current draw in addition to
> the normal KX3 current draw?
It is the total current drain, not additional current drain. And the
standby mode is already implemented -- the FAQ was written before the
firmware :-)
>> The KX3-2M and -4m specific order page is at the following address.
>>
>> http://www.elecraft.com/tmp/kx3_2m_4m.html
> The $60 premium charged for factory installation implies that there's some
> notable time and effort required. Is this an accurate anticipation? Will
> the factory-installation premium be the same for new KX3 units ordered with
> the KX3-2m option?
FT units have typically taken 30 to 60 minutes to install depending on
the individual doing it. Open the case, remove the ATU (if present),
install the SMA cable, snap in the LO cable, re-install the ATU (or the
interface board if no ATU was present), install the 2 M module (2
screws), snap on the shield cover, inspect your work, then close the
case. Enable the module through the menu and you're ready to go.
Manuals etc will be on the website in due time.
73,
Lyle KK7P
More information about the Elecraft
mailing list