[Elecraft] KX3 Extended VFO temperature compensation procedure
Phil Wheeler
w7ox at socal.rr.com
Mon Mar 17 23:50:16 EDT 2014
Done. It does take more than the nominal 30 min --
more like 90-120 min. But it's done.
Phil
On 3/17/14, 6:36 PM, Phil Wheeler wrote:
> Thanks, Olli. Starting it now.
>
> 73, Phil
>
> On 3/17/14, 5:52 PM, Oliver Dröse wrote:
>>
>> Optional.
>>
>> 73, Olli
>>
>> Contest, DX & radio projects: http://www.dh8bqa.de
>>
>>
>>
>> Am 18.03.2014 01:49, schrieb Phil Wheeler:
>>> Reading the document on this, I get the
>>> impression that the procedure is done wholly
>>> within the KX3, because in the latter
>>> "post-refrigerator" part it says "If the KX3
>>> is connected to a PC running KX3 Utility, data
>>> will be sent to the Command Tester screen."
>>> implying the connection to KX3 Utility is
>>> optional.
>>>
>>> Is connection to a computer required or optional?
>>>
>>> 73, Phil w7ox
>>
>
>
More information about the Elecraft
mailing list