[Elecraft] Kit Building "estimated" Times: KX1, W2, P3
Don Wilhelm
w3fpr at embarqmail.com
Sat Jul 17 14:26:07 EDT 2010
Phil,
Well, after building a LOT of KX1s (I've lost count), I can complete the
KX1, KXB3080, and KXAT1 in about 12 hours at the workbench. But
consider that I no longer read all the detail in the manual - I only use
it as a guide in the order in which to place the parts (do not try to
second guess that order). For the first time through a KX1 build, I
would estimate double the time it takes me, so somewhere in the range of
20 to 25 hours should be about right.
I have not yet built a W2, so no answer on that.
73,
Don W3FPR
Phil Hystad wrote:
> I have two kits right now and a third (the P3) on the way soon (I hope). I got the KX1 to replace my Norcal 40A QRP rig and I just got (yesterday) the W2 to add to my growing collection of SWR meters.
>
> My plan is to do the P3 first. So, I am waiting until the P3 arrives. But, I am thinking that maybe I can whip out the W2 pretty quickly. Therefore, can anyone give me an estimate of what I should expect on the W2 build time?
>
> I got estimates here for the K3/100 when I got that and my build time came right near the average of those values reported by various peoples (8 1/2 hours).
>
> So, I know that the P3 build time is probably not known by anyone other then beta kit builders. How about the average build times for the W2-kit (one coupler) and the KX1 kit (toroids done by the Toroid Guy, already here).
>
> 73, phil, K7PEH
>
> ______________________________________________________________
> Elecraft mailing list
> Home: http://mailman.qth.net/mailman/listinfo/elecraft
> Help: http://mailman.qth.net/mmfaq.htm
> Post: mailto:Elecraft at mailman.qth.net
>
> This list hosted by: http://www.qsl.net
> Please help support this email list: http://www.qsl.net/donate.html
>
>
More information about the Elecraft
mailing list