[Elecraft] Preparing for the Build of the K3 Kit S/N 3823
KC2VNI
steve at smarrano.com
Wed Jan 13 19:00:55 EST 2010
I recv'd the K3 and I am reading the instructions. I figured I'd ask some
basic questions on a few things before putting tab "A" into slot "B". (I've
already looked through the instructions to get an overview of what I should
expect and I'll read them again before diving into this)
1) A means to hold the smaller hardware- What types of holders or containers
do you guys use to hold the smaller screws?
2) Static electricity-I was going to purchase a static mat with a ground
strap. Some questions:
- Does anyone have experience with the type of static mat they sell at Radio
Shack?
- Is it acceptable to work on a wooden table top that has painted metal legs
and attach the ground from the mat to the table leg even if it's painted?
3) Multi-Meter: Is an inexpensive Radio Shack unit acceptable for measuring
the resistances that are discussed in the assembly manual? Does anyone have
suggestions about what model they would use?
As a side note, I've got my power supply (an Astron RS-35M) ordered so I'll
be able to hopefully conduct at least the "smoke test". The antenna will be
the next piece of the puzzle once the smoke test is out of the way.
Also, I'd like to pass my compliments along to those of you who've taken the
time to post you tube videos of their building experience. It's been
helpful.
As a general comment that is not of a technical nature, my feeling is that
this is going to take me longer than 7-8 hours to build. I'll let you know
how I'm progressing and if I have further questions.
I thank you in advance for whatever suggestions you may have.
73
KC2VNI
Steve
--
View this message in context: http://n2.nabble.com/Preparing-for-the-Build-of-the-K3-Kit-S-N-3823-tp4385677p4385677.html
Sent from the Elecraft mailing list archive at Nabble.com.
More information about the Elecraft
mailing list