I have to agree.
You probably recall this pearl of engineering scheduling wisdom:
"The first 90% of the work takes the first 90% of the schedule; the
remaining 10% of the work takes the other 90% of the schedule."
When you're exploring new territory, sometimes there are surprises and
you have to deal with them one at a time. Yeah, once you're into
production you can do a much better job of forecasting, but this isn't
production yet. They may be out of design development, but they've only
started manufacturing development. What we're talking about here- and
waiting for- are production prototypes that are defining the
manufacturing and testing processes thru which all following producution
must follow. Each of these K3s are being nurtured to life by hand. It's
going to get better, but not yet. I'm willing to bet that the mfg.
documents look like somebody bled on them from each days accumulated
redlines!
The inferred good news from all this is that we so far haven't heard
that the design has changed. That says a lot for the thoroughness of the
design phase and will hopefully make the passage to true production less
troublesome.
Bruce, NM5B
Santa Fe, NM
> ... I've worked in engineering too long. I know that you cannot
> believe
> an engineer when he gives you a schedule. Sorry, but we engineers are
> not good at it. Elecraft is doing their best and fortunately for us,
> their best means we get a great performing radio that is a great
> price.
> Personally, I've taken every schedule from Elecraft with a large grain
> of salt, thus keeping my expectations rather low.