[Elecraft] T3 continuity check
Don Wilhelm
w3fpr at earthlink.net
Tue Jun 19 17:50:10 EDT 2007
Nick,
Look at the schematic and you will see that there is a connection
between leads B and C are connected. The proper time to check for
shorted wires is before soldering onto the board - everything will
appear shorted for DC (but not RF) after soldering on the board.
73,
Don W3FPR
Nick T - NT1A wrote:
> Hello,
>
> I am just about to finish up K2 kit # 6163 and I have a question about toroid T3.
>
> When I do a continuity check between legs a,b,c, and d my meter is showing that all legs are connected electrically. Is this correct for T3?
>
> Under close inspection with a magnifying glass I do not see any shorts between the red and green wires so I assume the legs are connected "further up the road" between the traces on the pc board.
>
> Please let me know if I am on the right track before I button her up! Thanks!
More information about the Elecraft
mailing list