[Elecraft] Elecraft K3 Test Engineering Group at work
Eric Swartz - WA6HHQ, Elecraft
eric at elecraft.com
Sat Dec 29 12:53:31 EST 2007
Here 's a link to some pictures of our test engineering group cranking
out K3s. :-)
http://www.elecraft.com/K3/elecraft_k3_test_lab.htm
This should give you a feel for our test station set up. All of the
Agilent/HP test equipment and the K3 under final test is controlled from
a PC test program written by Brian, W6FVI. This significantly speeds our
final test, alignment, MDS testing etc.
Rene, Dale, Vic and Brian (not pictured) are a dedicated group. I was
just in the office this morning and it was getting crowded in the lab!
73, Eric WA6HHQ
More information about the Elecraft
mailing list