[Elecraft] Installing a 160 and 60 meter modules

Don Wilhelm w3fpr at earthlink.net
Thu Sep 14 10:57:21 EDT 2006


Mike,

Do the K160RX first and then add the K60XV is the short answer.

However if you have a high confidence level in your work ...
You can install almost all of both at once if you are careful, and you will
only have to remove the heat sink from the K2 once.

Install all the headers and parts that go under the heat sink in one pass:
If you do not have a 4.7 pf capacitor in your spare parts bin, temporarily
leave out the 4.7 pf capacitor from the K60XV so you have one for initial
testing, othewise build up both option boards.

Do the RF Board additions for both options EXCEPT, do not install D19 and
D20 and do not change C71 as instructed in the K60XV manual.

Replace the heat sink on your K2 and put a jumper between pins 3 and 5 of
J13 (replaces W1).  Put the legs of the 4.7 pf capacitor into pins 1 and 3
of J15 (to replace C6 which was removed).

You can now install the K160RX board and complete the testing for that
option.

Now solder the 4.7 pf capacitor onto the K60XV board, add D19 and D20 to the
RF Board, and change C71 to the 120 pf value per the K60XV instructions.

Install, align and test the K60XV and you will be done.

73,
Don W3FPR


> -----Original Message-----
>
> Ok, I have just finished the 160 and 60 meter modules. Here is a
> question for the collective Elecraft conscience, what order should I
> install them. The 160 meter, align and test, then the 60M, or the other
> way around? or do both and then test and align?
> Thanks
> Mike WA6ARA
>