[Elecraft] LP-100 Digital Vector Wattmeter kit 2nd run cutoff (was Z90 Panadapter Order Cutoff)

Larry Phipps larry at telepostinc.com
Sat Aug 12 10:10:39 EDT 2006


Speaking of cutoffs, I placed the parts orders for the 2nd run of LP-100 
kits earlier this week. This is a limited run, similar to the initial 
run, but I still have some slots left. You can read about the LP-100 at 
www.telepostinc.com/lp100.html, with links to the QEX article, eHam.net 
reviews, assembly manual, etc.

This is a perfect accessory for a QRP to QRO station. I offer free NIST 
traceable calibration of the finished kits if desired (you pay only for 
shipping).

73,
Larry N8LP
www.telepostinc.com



Jack Smith wrote:
> Just a short reminder that if you are planning to purchase a Z90 or 
> Z91 panadapter kit, the deadline to drop me an E-mail message is 
> Friday, August 18th.
>
> A few days after the 18th, I will order enough of the expensive 
> volume-sensitive parts (enclosures, LCD, PCB) to meet the order 
> requirements, to provide for two or three units for my use and to 
> provide a small quantity for spare parts support. This means that if 
> you miss the August 18th cut-off date, you will have to wait until the 
> next batch build, which may be a rather long time.
>
> I can accept orders for small things, such as the interface boards, 
> after the deadline date, up until I actually order those components.
>
> 73 de Jack K8ZOA
> www.cliftonlaboratories.com
> _______________________________________________
> Elecraft mailing list
> Post to: Elecraft at mailman.qth.net
> You must be a subscriber to post to the list.
> Subscriber Info (Addr. Change, sub, unsub etc.):
> http://mailman.qth.net/mailman/listinfo/elecraft   
> Help: http://mailman.qth.net/subscribers.htm
> Elecraft web page: http://www.elecraft.com
>
>
>


More information about the Elecraft mailing list