[Elecraft] K2 clarify please

W3FPR - Don Wilhelm w3fpr at earthlink.net
Sat Jun 4 18:17:08 EDT 2005


RC,

Yes, the center pad should be empty.  If you will be installing the K60XV
and have the kit right now, you can solder in the 3 pin header and stick the
leads of the 4.7 pf cap (C6) into the two outer header holes for testing (or
solder it to the outer header pins on the bottom) and save the trouble of
desoldering the capacitor when you add the K60XV.  DO NOT ATTEMPT TO INSTALL
CHANGES OTHER THAN THE HEADERS FOR THE K60XV AS YOU BUILD THE BASE K2.

73,
Don W3FPR

> -----Original Message-----
> From: elecraft-bounces at mailman.qth.net
> [mailto:elecraft-bounces at mailman.qth.net]On Behalf Of "RC" KC5WA
> Sent: Saturday, June 04, 2005 5:15 PM
> To: Elecraft List
> Subject: [Elecraft] K2 clarify please
>
>
> Assembly Part II
> On page 57 right side  FIRST instruction states "Find  the "C6" label ,
> along the back edge. The three pads near C6 are are labeled "J15"  on
> the top side ( for use with the K60XV option) Install C6 (4.7pf) into
> the OUTER two pads of the three pads" .....In other words the center pad
> of the three should be EMPTY?????
>
>
> --
> No virus found in this outgoing message.
> Checked by AVG Anti-Virus.
> Version: 7.0.322 / Virus Database: 267.4.1 - Release Date: 6/2/2005
>
> _______________________________________________
> Elecraft mailing list
> Post to: Elecraft at mailman.qth.net
> You must be a subscriber to post to the list.
> Subscriber Info (Addr. Change, sub, unsub etc.):
>  http://mailman.qth.net/mailman/listinfo/elecraft
>
> Help: http://mailman.qth.net/subscribers.htm
> Elecraft web page: http://www.elecraft.com
> --
> No virus found in this incoming message.
> Checked by AVG Anti-Virus.
> Version: 7.0.323 / Virus Database: 267.6.1 - Release Date: 6/3/2005
>
--
No virus found in this outgoing message.
Checked by AVG Anti-Virus.
Version: 7.0.323 / Virus Database: 267.6.1 - Release Date: 6/3/2005



More information about the Elecraft mailing list