FW: [Elecraft] K2 T3

Dan Barker dbarker at visioncomm.net
Wed Jun 23 08:40:13 EDT 2004


5 turns of bifilar winding IS 10 turns of wire. They are both right. The
difference is 4 leads instead of 2. Wind it EXACTLY as shown in the assembly
part, on p. 69. That's an excellent drawing.

Dan / WG4S / K2 #2456

-----Original Message-----
From: elecraft-bounces at mailman.qth.net
[mailto:elecraft-bounces at mailman.qth.net]On Behalf Of GS
Sent: Wednesday, June 23, 2004 8:22 AM
To: Mailingliste Elecraft
Subject: [Elecraft] K2 T3


Hi all,

I have a problem. After assembly my K2 (#4309) doesn't
have any output at all. So I went examining...

I suspect maybe T3 is wrong: Looking at the pictures
(appendix, not drawing in assembly section) in the
manual T3 clearly has more then 5 turns. Looking at K2
toroid pictures of ac6kw this toroid has 10 windings.

In my manual on p. 69 I am instructed to wind 5 turns
bi-filar.

What is right?

Thanks

Gerhard








___________________________________________________________
Bestellen Sie Y! DSL und erhalten Sie die AVM "FritzBox SL" für 0€.
Sie sparen 119€ und bekommen 2 Monate Grundgebührbefreiung.
http://de.adsl.yahoo.com
_______________________________________________
Elecraft mailing list
Post to: Elecraft at mailman.qth.net
http://mailman.qth.net/mailman/listinfo/elecraft
You must subscribe to post.
Subscriber Info (Addr. Change, Unsub etc):
http://mailman.qth.net/subscribers.htm
Elecraft page: http://www.elecraft.com



More information about the Elecraft mailing list