[Elecraft] T6 continuity checks

John R. Lonigro johnlon at sbcglobal.net
Thu Dec 30 20:48:34 EST 2004


Mike:

If you look at the schematic, you'll see that pin 3 of T6 is attached to 
pin 2 of T6.  You should get continuity between all leads.  If you 
DON'T, something is wrong.  Continue with your building...

73's,

John AA0VE

Mike wrote:

>I just finished installing T6 on the RF board, and did continuity checks just like all the other toroids up to this point.  I found continuity existing between all leads.
>
>By all visual inspections, it appears to be no shorts anywhere.
>
>Is this normal for T6?
>
>Thanks,
>Mike, NJ2OM
>
>  
>


More information about the Elecraft mailing list