[Elecraft] KX1 didn't take long enough to build?
Jay Blass
[email protected]
Mon Oct 27 16:02:16 2003
>We asked Ron, the author of the KX1 manual, to draw it out as much as =
possible.
>Hence all those photos ;)
I should ask Ron what he means on page 5, third assembly step where the =
builder is supposed to cut 1.5" lengths of "INSULTED" wire.=20
Now how exactly is the builder supposed to determine which wires have =
been insulted, and which have not? If the builder isn't sure, should =
he/she specifically insult a couple of the particular wires so as to be =
sure? Does anyone have any specific advice on how to insult a wire? =
Should you call it too skinny? Too short? Too long? Not shiny enough?=20
This KXB30 module is going to require some extra communications =
construction and comprehensive vocabulary!
Seriously- thank you for the clarification. The manual looks great. Very =
much looking forward to this kit. Don't understand why folks are upset =
about the minor wait...the anticipation is half the fun. Sort of like, =
well, forepl***
I better quit while I am ahead.
Thanks!
Jay
N5ACM
--- StripMime Report -- processed MIME parts ---
multipart/alternative
text/plain (text body -- kept)
text/html
The reason this message is shown is because the post was in HTML
or had an attachment. Attachments are not allowed. To learn how
to post in Plain-Text go to: http://www.expita.com/nomime.html ---