[Elecraft] KPA100 with Rev B K2 question and possible erratum
Bob Nielsen
[email protected]
Wed May 28 17:00:01 2003
In the KPA100 manual, p. 51, it says that if one has a Rev B or later
control board to skip the "next four steps," which involve cutting a
trace, adding a jumper from Q5 to U8 and a capacitor across P4 pins 1
and 5.
The FIFTH step is to add a jumper between U6 pin 25 and P4 pin 1.
According to the Rev B schematic, both of these points are labeled TXD
and an ohmmeter check indicates continuity between them, making the
jumper unnecessary.
Should the manual say to skip five steps instead of four?
73,
Bob, N7XY