[Elecraft] Another K2 On The Air!
Harry Yingst
[email protected]
Tue May 27 00:01:04 2003
My K2 (sn 3458), 160 Meter Option, & the SSB Board are done.
Total build time has been about two weeks (Nights & Weekends).
I still need to install the Noise blanker & Amp-Key Kit, but I'm
Waiting for the Amp-Key Kit to come in so I can Install them both in at
the same time.
Then I'll just waiting for the DSP unit (ordered it the second day they
were available).
So now that the hard part is over I can start to play with the filters
etc.
I downloaded Spectrogram (The free-ware one) and have started to tweak
and figure out the filters (far easier than anticipated).
And for those of you still building your first one...
The Toroids were not that hard to wind.
Every mistake I made was due to not paying attention to the manual and
to what I was doing.
There were a few times I referred to the Message archives, The
Reflector & the Elecraft Site for clarification (all were a big help).
Good Luck, & Thank you!
=====
--
Harry - AB2PN
__________________________________
Do you Yahoo!?
The New Yahoo! Search - Faster. Easier. Bingo.
http://search.yahoo.com