[Elecraft] Assembly time of KPA100 and KAT100
[email protected]
[email protected]
Thu Apr 24 10:09:00 2003
On Thu, 24 Apr 2003 [email protected] wrote:
> On 23 Apr 2003 at 14:22, [email protected] wrote:
>
> >
> > http://www.k4wtf.com/kat100/ shows the progress (with timestamps) of
> > my KAT100 from inventory to operational.
>
> Did you wind the toroids in 10 minutes or did you order the pre-fabbed
> ones? If you did wind them in 10 minutes what was in your tea?
>
>
>
> Best Regards, Keith
I used toroids from "The Toroid Guy"... If you look closely, I reference
that, without actually saying it... "07:40am - Time to wind...er...unpack
the toroids!" - with the picture showing a Priority Mail box. ;)
He does such a wonderful job on the toroids that I don't think I'll ever
hand wind one again.
73 de John - K4WTF