[Elecraft] Changed my mind too
[email protected]
[email protected]
Wed May 15 11:56:00 2002
Hi folks -
Too bad one couldn't pack enough gell cells into the EC2 to run both field QRP
and occassional moments of QRO. Now that would be cool! 73/Tim Logan NZ7C
Quoting Don Brown <[email protected]>:
> Hi
>
> I did the same thing and have changed my mind also. I am looking into
> removing the insides of the MFJ 4125 25 amp power supply and installing
> it into the EC2. If it will fit I think I will paint the face with the
> black area like the K2 and install a 3 1/2 digit volt and or amp meter
> in a cut out where the K2 display would be. I would then add the
> Elecraft clear plastic bezel over the meter and the power supply would
> match the K2 exactly. Should look cool next to the K2/100
>
> Don Brown
> KD5NDB
>
> ----- Original Message -----
> From: Terry Kniffen
> Sent: Wednesday, May 15, 2002 7:54 AM
> To: [email protected]
> Subject: Re: [Elecraft] Changed my mind too
>
> Lee Wrote:
>
> <SNIP>
>
> Lee, I ordered the EC2 along with the KPA100 as a knee jerk reaction,
> just
> cuz I planned on doing it that way all along. But I agree with you -
> it
> makes sense (now) to integrate it. I'll keep the EC2 and use it for
> something else. Who knows what else they may come up with to set along
> side
> the K2. I like these folks.
>
> 73 Terry KF4FD K2 # 2008
>
>
> --- StripMime Report -- processed MIME parts ---
> multipart/alternative
> text/plain (text body -- kept)
> text/html
> The reason this message is shown is because the post was in HTML
> or had an attachment. Attachments are not allowed.
> Please post in Plain-Text only.---
> _______________________________________________
> Elecraft mailing list: [email protected]
> You must be a list member to post to the list.
> Postings must be plain text (no HTML or attachments).
> See: http://mailman.qth.net/mailman/listinfo/elecraft
> Elecraft Web Page: http://www.elecraft.com
>