The B-Road site manager posted this to the RF Carrier List

FYI, with the amount of snow we got the lot has been plowed but there is a decent coverage (0 to 2 inches in places) due to drifting and the handicap spots adjacent to the ramp are completely covered with a couple feet of snow.  So bottom line is TNG is 100% doable but parking is reduced and with the blowing and drifting I can make no guarantees of what condition the lot will be (or even the sidewalk since right in front of the main doors is the worst for blowing and drifting).

I am on site now and have cleared the front walk and main ramp but it is slow going due to the wind and it is too cold for salt to do much.  I will be here all night working on it.

Rob KB8UEY