[Central-Electronics] 100V AF phase shifter
K6JEK
k6jek at comcast.net
Sat Dec 2 00:42:00 EST 2006
Bob,
I took the liberty of posting your response to the reflector since
others seem to be interested. That's about what I expected --
calibrated lab grade equipment. I'm heartened to hear that the PS-2
isn't likely the problem.
I'm actually in procrastination mode. I seem to have lousy opposite
side band suppression. I'm thinking about the problem rather than
doing anything about it -- avoiding hoisting the 100V from the
operating position to the work bench. Hoisting is next.
Thanks,
Jon, K6JEK
On Dec 1, 2006, at 6:44 PM, Bob Sullivan wrote:
> Jon,
>
> I do a lot of 100V/200V restoration work and infrequently the PS-2
> requires attention. Most hams don't have the equipment to measure to
> that accuracy which requires a high-end LCR meter or bridge that has
> been calibrated. An example would be the GenRad Model 1692. The
> (fairly) good news is that older versions that sold for 10K and up are
> now available for a fraction of that cost.
>
> When was the last time you sent a piece of test equipment to a
> calibration lab? Hi.
>
> 73, Bob
> WØYVA
> Personal site: http://www.isquare.com/personal_pages/ras-hardware.htm
>
>
>
> At 09:05 PM 12/1/2006, you wrote:
>> How do you work on the audio phase shift module? It's full of
>> resistors and capacitors "bridged to within .1%" How do you measure
>> capacitors and resistors that accurately?
>>
>> Jon, K6JEK`
>>
>> _______________________________________________
>> Central-Electronics mailing list
>> Central-Electronics at mailman.qth.net
>> http://mailman.qth.net/mailman/listinfo/central-electronics
>>
>
More information about the Central-Electronics
mailing list